Refine your search:     
Report No.
 - 
Search Results: Records 1-5 displayed on this page of 5
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Assessment of the functions of the impervious plug based on several monitoring results for groundwater recovery experiment

Matsui, Hiroya; Mikake, Shinichiro; Ikeda, Koki; Sasaki, Sadao

Dai-14-Kai Iwa No Rikigaku Kokunai Shimpojiumu Koen Rombunshu (Internet), 6 Pages, 2017/01

Japan Atomic Energy Agency (JAEA) has been conducting the groundwater recovery experiment to develop the methodology to estimate the recovery of geological environment after drift closure at GL-500m in Mizunami Underground Research Laboratory, Gifu prefecture, Japan. For the experiment, the impervious concrete plug was constructed to keep a recovered water pressure. The authors assessed the functions of the pluge based on monitoring and interpretation of the several kinds of measurements inside and outside of the plug during groundwater recovery process in a drift. As the results, the design concept and the expected function of the impervious plug assessed almost satisfied and it is supposed no problem will occur on the groundwater recovery experiment for several months.

Journal Articles

Hydrogeomechanical properties of excavation damaged zones along galleries in different depths of the Horonobe underground research laboratory

Aoyagi, Kazuhei; Ishii, Eiichi

Dai-14-Kai Iwa No Rikigaku Kokunai Shimpojiumu Koen Rombunshu (Internet), 6 Pages, 2017/01

The objective of this research is to investigate the hydro-mechanical properties of excavation damaged zones (EDZs) along the galleries excavated in 250 m and 350 m depths. We conducted hydraulic tests, BTV observations and core analyses. As a result, in the 250 m gallery, the extent of the EDZ was 1.0 m into the gallery wall. The hydraulic conductivity was increased by 2 to 3 orders of magnitudes compared with that of intact rock. On the other hand, in the 350 m gallery, the extent of the EDZ was 0.4 m into the gallery wall; the hydraulic conductivity was increased by 5 orders of magnitudes compared with that of intact rock. We investaged the difference of the characteristics of the EDZs on the basis of competence factor and ductility index. As a result, it was estimated that an extent of an EDZ decreases with decrease of competence factor; a hydraulic conductivity in an EDZ increases with decrease of ductility index.

Journal Articles

Estimation of rock mass stress state based on the convergence measurement result during tunnel excavation

Kamemura, Katsumi*; Aoyagi, Kazuhei; Nago, Makito*; Sugawara, Kentaro*; Matsubara, Makoto*

Dai-14-Kai Iwa No Rikigaku Kokunai Shimpojiumu Koen Rombunshu (Internet), 6 Pages, 2017/01

In the design of deep underground structures such as high-level radioactive waste disposal repositories, the estimation of rock mass stress state is important as well as the estimation of mechanical characteristics of rock mass. This study establishes a practical and effective method for estimating in situ stress based on the convergence measurement results obtained during gallery construction of URL. The convergence was measured in various directions of the URL loop gallery at 350 m depth, and this will allow determination of the stress state over a large area using a back analysis method. In order to improve the accuracy of initial stress estimation, the relationship between convergence measurement results and geological situation of existing fractures were studied. The analysis results show good agreement with the in situ stress state results reported in previous studies and confirm the applicability of the proposed method.

Journal Articles

Long-term evaluation of excavation damaged zone by optical measurement in Horonobe Underground Research Laboratory

Hata, Koji*; Niunoya, Sumio*; Aoyagi, Kazuhei

Dai-14-Kai Iwa No Rikigaku Kokunai Shimpojiumu Koen Rombunshu (Internet), 6 Pages, 2017/01

The objective of this research is to investigate the long-term hydro-mechanical behavior of rock mass around the shaft in the Horonobe Underground Research Laboratory (URL). The long-term monitoring has been carried out by optical AE sensors, optical water pressure sensors, and optical temperature sensors below 350m depth of the shaft in the Horonobe URL. From the measurement results, the extent of an excavation damaged zone was 1.5m within the shaft wall. After the excavation, it was observed that the unsaturated zone of the groundwater was spread more than 1.5m within the shaft wall.

Journal Articles

Numerical analysis of the grout injection conducted in the ventilation shaft of the Horonobe Underground Research Laboratory

Nakashima, Hiroyoshi*; Koyama, Tomofumi*; Tatsuta, Keisuke*; Katayama, Tatsuo*; Aoyagi, Kazuhei

Dai-14-Kai Iwa No Rikigaku Kokunai Shimpojiumu Koen Rombunshu (Internet), 6 Pages, 2017/01

In this study, we created the three dimensional model based on equivalent continuum approach to study the penetration length and enhancement of the hydraulic conductivity of the rock mass. The developed numerical model was applied to the in situ grout injection conducted in the ventilation shaft of the Horonobe Underground Research Laboratory. We evaluated the hydraulic conductivity of the rock mass after the grout operation. As a result, hydraulic conductivity of the highly permeable fault was decreased in 4 orders of magnitude, which is almost consistent with the in situ hydraulic conductivity obtained from in situ Luegeon test after the grout injection. Thus the simulation method described in this paper can be applied to the evaluation of the efficiency of in situ grout injection.

5 (Records 1-5 displayed on this page)
  • 1